Case Studies

Multifamily EV charging projects, explained clearly

See how PlugOp handles the real work behind multifamily EV charging — from assigned resident charging and new-construction planning to rapid portfolio replacements.

Case study

The work, the transition, and the operating result

01

Assigned and shared apartment charging

A 600-unit Columbus community built assigned and shared EV charging into new construction

See how an 18-port PlugOp deployment at a 600-unit Columbus apartment community combined assigned and shared charging, met local EV parking requirements, and created a scalable path for growth.

18 charging ports, including eight assigned spaces, on an electrical design that can support four chargers per circuit.

600-unit Class A apartment community in Columbus, OH18 charging ports across a six-floor, 737-space garageEight assigned ports and 10 shared ports
Read case study
18 Installed charging ports8 Assigned ports600 Residential units

02

Multi-state charger replacement

UDR replaced an underperforming six-property charging program in eight days

See how PlugOp replaced 84 chargers across six UDR properties in four states in eight days, then centralized commissioning, communications, onboarding, and support.

84 chargers replaced across six properties and four states in eight days.

84 chargers across six multifamily propertiesFour-state rollout completed in eight daysTransition completed before the incumbent software renewal date
Read case study
84 Chargers replaced6 Properties4 States

03

National portfolio charger replacement

A national owner-operator replaced 127 charging ports across 17 assets in about two months

See how PlugOp audited and replaced 127 charging ports across 17 assets in six major markets in about two months for a national multifamily owner-operator, then centralized pricing, support, reporting, and live charger visibility.

127 charging ports replaced across 17 assets and six major markets in about two months.

127 charging ports across 17 assetsSix major markets: CA, PA, TX, MD, DC, and MAPortfolio replacement completed in about two months
Read case study
127 Charging ports replaced17 Assets6 Major markets

04

Pre-construction EV value engineering

A 289-unit Medford development designed to meet the 20% EV code with one panel instead of three

See how PlugOp's load-management analysis supported a 66-port EV charging design for The Clayborn, a 289-unit Medford, MA development, meeting the city's 20% EV code with one 400A panel instead of three.

A 66-port design that meets Medford's 20% EV code using one 400A panel instead of three.

289-unit Medford, MA development66 planned charging ports across 318 spacesOne 400A panel in place of three
Read case study
66 Planned charging ports289 Residential units3 → 1 Service panels (design)